Project Reference List
No | Postal Address of Client | End User | Project Name | Project Location | Period | Po / Contract No. |
1 | PT. Farrel Internusa Pratama | Petrochina International | Pekerjaan Underwater Impress Current Cathodic Protection (ICCP) Anode Construction, Site Survey, for Upgrading Cathodic Protection System of Kasim Marine Terminal Papua (PC-477-CA) | Papua | February 2009 | PO NO :
015/PO/FIP/II/2009 |
2 |
SPBU Cililin Bandung
|
SPBU Cililin Bandung | PemasanganSacraficialAnode Cathodic Protection (SACP) Construction, Site Survey, for Upgrading Cathodic Protection System of SPBU Cililin Bandung | Bandung | March 2009 | |
3 | PT. Wilson Taylor Asia PTE Ltd | PT. Petrosea | Pemasangan Impress Current Cathodic Protection (ICCP) Construction, Site Survey, for Upgrading Cathodic Protection System of PT. IndomincoBontang Marine Terminal |
Kalimantan
|
April 2009 | PO NO :
005/PO/WTA/IV/2009 |
4 | CV. Bumi Sejati | PT. PERTAGAS Sumbagut | Pekerjaan Cleaning Pigging Pipeline 10” x 258 KM | Sumatera Utara | January 2010 | PO NO :
010/PO/BS/I/2010 |
5 | PT. Sinar Karya Mandiri Aceh | PT. Pertamina EP | SACP Construction, Site Survey, for Upgrading Cathodic Protection System of Pipe Relocation 15 km 28” Medan Sumatera Utara | Medan – Sumatera Utara | March 2011 | SP3MP N0 : 0010A/S-LL/PMN/2011 |
No | Postal Address of Client | End User | Project Name | Project Location | Period | Po / Contract No. |
6 | PT. Wijaya Karya | PT. Indonesia Power | Impress Current Cathodic Protection (ICCP) Construction, Site Survey, Commissioning and Reporting for Upgrading Cathodic Protection System | Manado – Sulawesi Utara | June 2012 | No PPB : TP.01.06/H.DEP.PE.0300/2012 |
7 | PT. Paloh Sing kwangstabat | PT. Pertamina EP | ICCP Construction, Site Survey, Design the system, Installation,Commissioning and Reporting for Upgrading Cathodic Protection System | Medan – Sumatera Utara | October 2013 | PO NO :
008/PO/PSS/X/2013 |
8 | PT. Mulyo Rejeki Abadi | PT. Pertamina Gas | Pemasangan SACP Construction, Installation, Commissioning and Reporting for Upgrading Cathodic Protection System of PT. Pertagas from PondokUngu to PLTGU MuaraTawar | Bekasi – Jawa Barat | November 2013 | Kontrak SP-656/PG0330/2013-SO
PO No : 390025051/29.11.2013 |
9 | PT. Rosica Berlian Jaya | PT. Pelindo IV Cabang Gorontalo | Pemasangan SACP Construction, Installation, Commissioning and Reporting for Upgrading Cathodic Protection System of TiangPancangdariDermaga II keDermaga III | Gorontalo-Sulawesi | June 2014 | PO NO :
007/PO/RBJ/VI/2014 |
10 | PT. Sinar Karya Mandiri Aceh | PT. Pertamina EP | ICCP) Construction, Site Survey, Design the system, Installation, Deep Well Anode Ground bad, Commissioning and Reporting for Upgrading Cathodic Protection System | Medan-Sumatera Utara | August 2014 | SP3MP N0 : 0013A/S-LL/PMN/2014 |
No | Postal Address of Client | End User | Project Name | Project Location | Period | Po / Contract No. |
11 | PT. Has Sambilawang | PT. Pertamina EP | (SACP) Construction, Site Survey, Design the system, Installation, Deep Well Anode Ground bad, Commissioning and Reporting for Upgrading Cathodic Protection System | Cirebon-Jawa Barat | January 2015 | KontrakNo : 4650005115
SPMK N0 : 101/EP2230/2014 |
12 | PT. Trowells Energy | PT. Pertamina EP | Pemasangan Cathodic Protection Packaged untukPipaminyakØ 8” sepanjang 13 Km x 2 | Palembang – Jambi | February 2015 | PO N0 : 015/JKT/TE-PO/I/2015 |
13 | PT. JFE-JFEEI-PP | PT. PGN (Persero) | Pekerjaan Cathodic Protection PipaØ 24 “ sepanjang 11,5 Km (GLTA-CP21A) | Gresik – JawaTimur | Juni 2015 | Kontrak No.
009 / CATHODIC/GLTA-IPP/VI/2015 |
14 | PT. Wijaya Karya | PT. PLN (Persero) | Proyek PLTU 2 SULUT 2 x 25 MW | Sulawesi Utara | Juli 2015 | No PPB : TP.01.03/H.DEP.PE.0330/2015 |
15 | PT. Eltran Indonesia | PT. Pertamina (Persero) | PemasanganAnoda Korban SACP Gas Pipeline Pembangunan SPBG Area Cirebon | Cirebon – Jawa Barat | November 2015 | PO NO :
007/PO/EI/SPM/XI/2015 |
16 | PT. Mirza Rekagas Utama | PT. Pertamina (Persero) | PemasanganAnoda Korban SACP Gas Pipeline Pembangunan SPBG Area Purwakarta | Purwakarta – Jawa Barat | Januari 2016 | PO NO :
006/PO/MRU/I/2016 |
17 | PT. Rekayasa Perdana | PT. Pertamina (Persero) | PemasanganAnoda Korban SACP Gas Pipeline Pembangunan SPBG Area Depok | Depok – Jawa Barat | Februari 2016 | PO NO :
017/PO/RP/II/2016 |
No | Postal Address of Client | End User | Project Name | Project Location | Period | Po / Contract No. |
18 | PT. Rekayasa Perdana | PT. Pertamina (Persero) | PemasanganAnoda Korban SACP Gas Pipeline Pekerjaan SPBG Semarang | Semarang – Jawa Tengah | Februari 2016 | PO NO :
018/PO/RP/II/2016 |
19 | PT. Bina Rasano Engineering | PT. Pertamina (Persero) | Pekerjaan Cathodic Protection Service Project SPBG EcostationTahap 1 Site Cilandak KKO, TB Simatupang, danMargonda | Jakarta &Jawa Barat | Februari 2016 | PO NO :
048/05/PROJ.ECO.I/5.05.004/II/16 |
20 | PT. PGAS Solution | PT. PGN (Persero) | Pengadaan Material Cathodic Protection SACP untukKawasanMillenium Tangerang Project JBB 4 | Banten | Maret 2016 | PO NO :
00201.PO/JBB4/PGAS/III/2016.WIL1 |
21 | PT. PGAS Solution | PT. PGN (Persero) | Pengadaan Material Cathodic Protection SACP untuk area Cirebon Project JBB 4 | Jawa Barat | Mei 2016 | PO NO :
00400.PO/JBB4/PGAS/V/2016.WIL1 |
22 | PT. PGAS Solution | PT. PGN (Persero) | Pengadaan Material Cathodic Protection SACP untuk area Cikarang Project JBB 4 | Bekasi – Jawa Barat | Mei 2016 | 00500.PO/JBB4/PGAS/V/2016.WIL1 |